Client Comments
Thank you so very much for putting so much effort and time for helping us.

-DARIO & MORCIA S., OAKVILLE

___________________


We were so happy that you were able to provide us with construction financing. The draw amounts work fine with our builder and we plan to refer anyone building a house. Thanks again.

-TOM & SHAUNA D., TORONTO

____________________


Hi Joe Just wanted to pass on our thanks again for all your help with securing our mortgage.

In hindsight, we would have to say that the entire process of buying for the first time went really well and we managed to avoid a lot of the headache and inconvenience that others seem to come across.

Certainly in regard to arranging our mortgage, things could not have been easier for us and we have you to thank for that.

Your patience and attention to detail was greatly appreciated.

All the best,

A. Aghazzarian & L. Marino

Inspection Reports for Construction Loans

If you’re looking into construction loan financing and wondering how a lender determines how much of the project is completed at any point in time, here is an example of an inspection assessment that would be similar for many construction lenders.contact joe button4 Inspection Reports for Construction Loans

By applying the example that follows, a lender or third party appraiser  will inspect the project at certain points in time and utilize the inspection report to determine how much has been completed and how much of the project remains outstanding.

This is important when a construction mortgage lender is reviewing a draw request in that the lender will always make sure there are sufficient funds retained to complete the job and if the draw requested has not completed enough specific stages of the project, then its likely the construction draw will be reduced.

Here is an example of a lender inspection report.

Inspection Report Example
Stages Assessed % Applied % Complete
Excavation 2
Foundation 12
Sub-Floor 1
Framing – Begin 10
Framing – End 10
Roof 3
Doors / Windows 8
Soffits / Facia / Eaves 1
RI Electrical 2
RI Plumbing 2
RI Heating 1
Basement Floor 2
Insulation / Vapour Barrier 1
Heating Equipment 2
Drywall / Primer 7
Interior Doors / Casing 3
Cabinetry / Counters 6
Paint / Stain 7
Flooring 6
Finish Electrical 1
Finish Plumbing 2
Exterior Finishing 8
Concrete Work 2
Grading / Decks / Landscaping 1
TOTAL 100 100

From a borrower and/or builder point of view,  the inspection report allows you to make sure the expected work for any particular draw is going to be completed on time.

Its also important to make sure that stages are completed prior to an inspection if possible to avoid an arbitrary assessment of how much is left to be done at a particular stage which could also lead to a draw reduction.

To be clear, if a draw does get reduced for whatever reason, that means there are now less funds available from the construction loan to pay the bills incurred to date.  The short fall will have to be made up with another source of funds which hopefully can be done in a timely manner so the overall project does not get delayed in any way.

While the description of the stages and percentages applied may vary among lenders, the example provided is pretty representative of what you will expect with a home construction project.

If you’re trying to locate and secure construction financing, I recommend that you give me a call so that I can quickly assess your situation and outline relevant options that can work for your project.

Click Here To Speak With Construction Mortgage Broker Joe Walsh

Technorati Tags: , , , ,

Related posts:

  1. Construction Mortgage Draws Can Be Challenging To Manage.
  2. Conditions & Requirements of Institutional Construction Loans
  3. Construction Loans For Home Renovation
  4. In Construction Financing, Cash Is King
  5. Construction Financing Budget

Leave a Reply

Broker Affiliations




Mortgage Article Archive